Image | Part code |
dslp1 | |
dslp2 | |
ds3 | |
ds2 | |
ds1 | |
ds4 | |
ds5 | |
ds6 | |
ds7 | |
o-rings made of silicone |
|
3,5 x 16 – 19 units | ds screw pack made of S/St A2 |
2,9 x 16 – 3 units | ds7 screw pack made of S/St A2 |
4,2 x 16 – 6 units M5 x 12 – 6 units M5 – 6 units |
dsd screw pack made of S/St A4 |
- Сhoose a suitable place for your ventilator ensuring that there are no obstructions above or below the deck.
- Using DS7 as a template mark and cut hole through deck / roof / hatch.
DS7 requires cutting to length prior to assembly. Place DS7 in the hole and measure and mark so that 1 or 2 mm extends below roof. - Trial fit DS1 and DS7 first, then DSLP2 and screw into position. Ensure that they fit correctly before proceeding.
- Remove DS1 and DSLP2 and refit using a suitable marine sealant, wait until the sealant hardens.
Ensure that the floating balls and the housings for the free floating balls are clear of debris and excess sealant. - Fit O-rings.
- Complete assembly by fitting DS2, DS3 and DSLP1.
- Do not forget to place DS4 into position and screw to DS5 before fitting DS3.